From the fall of 2011 through the end of spring 2012, the James R. Macdonald Lab has been remodeling. Our various laser-atom studies have displaced some of our old particle accelerators, and have grown beyond the space we originally allotted for them.
The floors immediately surrounding PULSAR were refinished at the end of June and the first of July. Optics tables moved into both the laser room and attosecond research areas, and the new network finally went live.
Each thumbnail below links to a much larger image about 900 kB in size.
Return to the Photo Gallery index.