From the fall of 2011 through the end of spring 2012, the James R. Macdonald Lab has been remodeling. Our various laser-atom studies have displaced some of our old particle accelerators, and have grown beyond the space we originally allotted for them.
The first of June saw the PULSAR area ready for an architect's walkthrough, and cable being pulled though the trays all over the lab. Conduit for the network cabling and emergency lighting has been installed for PULSAR.
Each thumbnail below links to a much larger image about 900 kB in size.
Return to the Photo Gallery index.