From the fall of 2011 through the end of spring 2012, the James R. Macdonald Lab has been remodeling. Our various laser-atom studies have displaced some of our old particle accelerators, and have grown beyond the space we originally allotted for them.
Work over 08-09 May 2012 focused on HVAC ductwork. Recirculating filters appeared in the ceiling spaces and sheet metal got cut and bent into main ductwork.
Each thumbnail below links to a much larger image about 930 kB in size.
Return to the Photo Gallery index.