From the fall of 2011 through the end of spring 2012, the James R. Macdonald Lab has been remodeling. Our various laser-atom studies have displaced some of our old particle accelerators, and have grown beyond the space we originally allotted for them.
By late October most of the magneto-optical trap (MOT) gear had found its way into its new home. Optical tables and other gear joined the trap itself, but everything still needed proper reassembly.
Each thumbnail below links to a much larger image about 1.1 MB in size.
Return to the Photo Gallery index.