We've battled leaks from our flat laboratory roof for years. Things came to a head in late summer 2021 when we sprang a major leak over the FLAME lab (the former "long room"). The older lab area roof accordingly got replaced in mid-November.
Each thumbnail below links to a much larger image about 3.7 MB in size.
Return to the Photo Gallery index.