JRM Logo The JRM Photo Gallery:
Metrology Labs - Part 2


Progress was slow, but before Christmas we were able to start moving equipemnt into the new and refurbished lab areas. As before, you can see more at Brian Washburn's lab blog.

Each thumbnail below links to a much larger image about 480 kB in size.

 

Picture
By mid-November of 2005, we were finally into the finish work.
 
Picture

 
Picture
There's going to be lots of power outlets...
 
Picture

 
Picture
Looking into the corner between the MOT and Brian's new lab, still needing a door.
 
Picture
The MOT's new computing and study area.
 
Picture
By December, Brett is hard at work in his new space.
 
Picture
Both rooms now have doors!
 
Picture
With the Square Room now carved up, it got a little loud around the COLTRIMS area. Some cubical walls helped that.
 
Picture

 
Picture

 
Picture
At left, the overhead storage takes shape in Brian's lab, while above, furniture begins to appear.
 

NavBar