Basic Operations for KLS Operators
Following operations can ONLY be conducted by KLS operators listed below. If someone wants to be added into this list, please contact Bing Shan. Current eligible laser operators are,
Bing Shan Ali Alnaser
Jiangfan Xia Stefan Voss
Mahendra Shakya Mikhail Zamkov
Shambhu Ghimire Pengqian Wang
Please come to Bing Shan if you have any question about the operations. At least one operator should be responsible to the whole system whenever the laser is on. This person is usually designated in the weekly laser schedule.
1. Turn on system
a. Chillers (pump1 and pump2)
b. LN2 (controller and big dewar)
c. Oscillator waveform (oscilloscope)
d. Pockels cell controllers (7.5 kV)
e. Pump laser controllers
f. Control computer
g. Output power and pulse shape (power meter, oscilloscope)
h. Output configuration (see next 2 pages)
2. Turn off system
a. Control computer
b. Pump laser controllers
c. Pockels cell controllers
d. Beam block
e. Chillers
3. Other operations
a. Beam alignment
b. ECR/LINAC alignment (ECR/LINAC users only)
c. Fiber alignment (fiber users only)
d. Lab clean (KLS group member only)
e. Refill oscillator chiller (KLS group member only)
All mirrors/beamsplitters are installed in flipper mounts. Three standard configurations are available by different combinations of these mirrors (see next page). The output beams and related experiments are,
1.Beam 0 (not shown in the figure): 4 nJ, 75 MHz
C-E Phase
2.
Beam
1: 2 mJ, 2 kHz
HHG
Streak Camera
ECR/LINAC
3.Beam 2: 1 mJ, 2 kHz
Pump-probe
Streak Camera
4.Beam 3: 1 mJ, 2 kHz
ECR/LINAC
Atto
Streak Camera
HHG
5.Beam 4: 0.2 mJ, 2 kHz
LColtrims
ECR/LINAC
Machining
MOT
FROG
6.Fiber 1: 70 mJ, 2 kHz
LColtrims
FROG
7.Fiber 2: 0.4 mJ, 2 kHz
HHG
Atto
FROG
Output Configurations



Possible beams for
experiments:
ECR/LINAC Beam Alignment

Evolution-30 LBO Temperature Control
Other possible settings: PId1 (PID), InP1 (Input 1), InP2 (Input 2), Out1 (Output 1), Out2 (Output 2), gLbL (Global)